Month: February 2021

Ngethu Treatment Works

NGETHU WATER TREATMENT WORKS

Located in Gatundu  North , Kiambu County  Ng’ethu Phase 1 commissioned in 1974 with nominal design output of 61,000m3/day Ng’ethu Phase II -Commissioned in 1984 with nominal design output 157,000m3/day Ng’ethu Phase III -Commissioned in 1997 nominal design output of 222,000m3/day Ng’ethu Treatment plant is designed to produce a rated nominal output of 440,000m3/day of potable …

NGETHU WATER TREATMENT WORKS Read More »

kikuyu dam spring

KIKUYU SPRINGS

Constructed in 1913 Total production for Spring No.1 is estimated to be 2,000m3 per day, while production from spring 2 is 4000m3 per day.  Combined total production from Kikuyu springs is estimated as 6000m3 per day.  Areas which benefit from this water are: – Karen, Dagoreti, Kawangware, Riruta, Uthiru & environs.  Located near Magana Flowers …

KIKUYU SPRINGS Read More »

Joint Workshop between NMS, NCCA & NSWSC

INAUGURAL JOINT WORKSHOP BETWEEN NMS, NCCA & NCWSC

The Nairobi City County Assembly Sectoral Committee on Water and Sanitation set about a week- long workshop with the Nairobi Metropolitan Services and Nairobi City Water & Sewerage Company Ltd at Pride Inn Paradise, Mombasa. This workshop was particularly important since the inception of the Nairobi Metropolitan Services (NMS) in March 2020, that saw four …

INAUGURAL JOINT WORKSHOP BETWEEN NMS, NCCA & NCWSC Read More »