Ngethu Treatment Works

NGETHU WATER TREATMENT WORKS

Located in Gatundu  North , Kiambu County  Ng’ethu Phase 1 commissioned in 1974 with nominal design output of 61,000m3/day Ng’ethu Phase II -Commissioned in 1984 with nominal design output 157,000m3/day Ng’ethu Phase III -Commissioned in 1997 nominal design output of 222,000m3/day Ng’ethu Treatment plant is designed to produce a rated nominal output of 440,000m3/day of potable …

NGETHU WATER TREATMENT WORKS Read More »

kikuyu dam spring

KIKUYU SPRINGS

Constructed in 1913 Total production for Spring No.1 is estimated to be 2,000m3 per day, while production from spring 2 is 4000m3 per day.  Combined total production from Kikuyu springs is estimated as 6000m3 per day.  Areas which benefit from this water are: – Karen, Dagoreti, Kawangware, Riruta, Uthiru & environs.  Located near Magana Flowers …

KIKUYU SPRINGS Read More »

NCWSC Thanksgiving Service

NCWSC HOLDS THANKSGIVING SERVICE

The Headquarters lnter-denominational Fellowship recently held a last special thanks-giving service for this year. The service was conducted in strict adherence of the Covid-19 protocols. The event also provided a platform to take stock of the highs and lows since the onset of the pandemic. The traditional monthly prayer services were suspended early in the …

NCWSC HOLDS THANKSGIVING SERVICE Read More »

Ruiru Dam

RUIRU DAM

Located in Githunguri, Kiambu County on Ruiru River Completed in 1950 Storage Capacity is  2.9 million m3 Stores raw water with yield  of 21,600 m3 /day  Water from the dam is treated at Kabete Treatment plant Pipeline to Kabete is 25Km Contributes approximately 4% of Nairobi’s current water supply.