THIKA DAM
Located in Ndakaini in Murang’a County Completed in 1994 under the Third Nairobi Water Supply Project between 1989 and 1994. Designed storage capacity is 70,000,000 m3 Linked to Chania River by 4KM tunnel which serves Ngethu Water Treatment Works Pipeline is 90 Km to Nairobi City Catchment area measures 75Km2 Main rivers that drain into …